欧美日韩黄色大片-欧美日韩黄片在线看-欧美日韩国产综合在线-欧美日韩国产综合在-欧美日韩国产综合一区二区-欧美日韩国产综合一

Welcome to Suzhou Xinrongfa Metal Products Co., Ltd.
CN EN

Adhering to quality is the life of an enterprise

Coating spraying of Teflon, tungsten carbide and alumina

Service hotline:

15995489385

+ Wechat number:wechat number

Your location: Home > Information dynamics > Industry dynamics

Recommended products

National Service Hotline

15995489385

Introduce the nine operating steps of ptfe lining

Source:en      Release date: 2022年05月20日
Information summary:With the continuous improvement of high temperature resistance and corrosion resistance requirements of materials, ptfe lining has gradually entered people's field of vision.
With the continuous improvement of the requirements for high temperature resistance and corrosion resistance of materials, ptfe lining has gradually entered people's field of vision. Relying on its good physical properties, it has been affirmed by many customers, but the specific steps for this type of spraying What is it like? I think many people don't know much about it and are very interested in it. To this end, I will introduce the nine steps of ptfe lining: Step 1: Check     whether there are pores, deformations, gaps and other poor welding conditions on the
     surface of the sprayed material .      Step 2: Preparation     1. Grinding: Use an angle grinder to carefully grind the burrs, welding slag, sharp corners, and sharp corners on the surface of the material.     2. Degreasing: Use 420 ℃ high temperature degreasing for empty burning, set the holding time according to the size and weight of the workpiece, and burn off the residual oil of the material.     3. Surface roughening: sandblasting adopts 5 to 7 kg air pressure, and the surface of 20# gold steel sand is evenly sandblasted.      Step 3: Pre-treatment of ptfe spraying     1. Put the workpiece on the inner shelf of the oven.     2. Use an air gun with a pressure of not less than 5kg to blow off the dust on the sandblasted surface.     3. Before spraying, the material is preheated and dried to remove the residual water on the surface.      Step 4: Preparation before primer spraying     1. Carry out vulcanization treatment 10 minutes ahead of the spray primer.     2. Check whether the powder output, static electricity and air pressure of the electrostatic spray gun are normal. If there are any abnormal problems, they should be solved in time to ensure smooth spraying.     3. Wear protective masks, glasses and dustproof clothing.      Step 5: Primer spraying     1. The material used is ECTFE special primer, and the specific type of primer is selected according to customer requirements.     2. The thickness of the sprayed film is about 0.16 mm, and the baking temperature is 280 °C.
     Step 6: The preparation work before
    coating is similar to primer spraying. Vulcanize the coating material 10 minutes in advance, and check whether the powder output, static electricity and air pressure of the electrostatic spray gun are normal. If there are any abnormal problems, they should be solved in time. Ensure smooth spraying.
     Step 7: Coating operation
    1. The material used is ECTFE type.
    2. The thickness of each spraying film is between 0.15mm-0.25mm.
    3. The sintering temperature is 260°C, and the holding time will vary according to the size and weight of the sprayed material.
    4. Repeat spraying and sintering.
     Step 8: Detect the coating
    1. Use a film thickness gauge to measure the thickness of the ptfe lining to check whether it meets the corresponding standard.
    2. Check the surface for chromatic aberration, sand, sagging, etc.
    3. Laser detection is carried out on the surface of the material through the coating detection technology, and no sparks are generated as the standard.
     Step 9: Pack and transport the materials. Pack the materials
    with bubble wrap and pearl cotton to avoid bumps and damages during transportation.
     The above is a brief introduction to the ptfe lining process. If you want to know more details, welcome to our Suzhou Xinrongfa Metal Products Co., Ltd. for consultation and understanding.
主站蜘蛛池模板: 国产精品成人无码久久久 | 五月天婷婷丁香花综合缴情 | 91麻豆精品一二三区在线国语 | 国产美女丝袜高潮 | 五月天国产成人av免费观看 | 欧美日韩在线免费一区二区三区 | 国产成人久久精品一区二区 | 91亚洲国产第一精品 | 中文字幕无码精品亚洲资源 | 特级BBBBBBBBB视频 | 国产超短裙丝袜在线播放 | 国产99久久亚洲综合精品西 | 人人在线碰碰视频免费 | 性做久久久久久免费观看 | 高清不卡日本v二区在线 | 无码精品国产dvd在线观看9久 | 国产系列丝袜熟女精品视频 | 亚洲日韩精品无码一区二区三 | 欧美牲交a欧美牲交 | 丝袜美腿一区二区三区 | 日本国产最新一区二区三区 | 中文字幕乱码熟妇五十中出 | 日本视频在线 | 欧美一级久久久久久久大 | 亚洲乱码中文字幕 | 亚洲日本视频 | 国产成人精品成人a在线观看 | 91精品无码国产一区二区三区 | 国产强奷在线播放免费不卡 | 偷拍欧美亚洲第二页 | 国产欧美日韩综合精品一区二区三区 | 国产欧美一级二级精品日韩 | 精品国产一区二区三区av性色 | 91在线精品亚洲一区 | 成人黄色网站在线播放视 | 2024国自拍产精品视频 | 丁香五月综合缴情电影丁香五月的浪漫影视作品 | 99久久精品国产高清一区二区 | 亚洲国产精品一区二区久 | 久久久精品波多野结衣 | av天堂午夜精品一区二 |